The introduction of 1.5t energy-conservation medium frequency induction furnace
(Aluminum shell machine gearing)
1. Model number: Rated capacity of furnace 1.5t, rated power of medium frequency supply 1000KW.
2. Complete set supply range: Furnace body 2set, tilting furnace gearing device 2set, cooling water cable (5m) 8pc, medium frequency supply cabinet 1set, capacitor cabinet (open type)1set, low voltage distribution cabinet 1set, furnace body water tank 1pc, power supply water tank 1pc, capacitor cabinet water tank 1pc, tilting furnace control box 1set, crucible 1pc.
Spare parts: master control board 1pc, KK tube 1pc, KP tube 1pc.
3. Technical parameters: 3- phase input voltage of medium frequency supply source690V, 50Hz, output voltage of medium frequency supply 1250V. Rated power 1000KW, frequency 500Hz, inductor inner diameter Φ780, inductor height 1100.
4. Fit out components: Medium frequency power supply internal silicon- controlled rectifier (SCR)for KP tube 1500A/2200V, KK tube 1800A/1800V(all selecting China famous bland), low- voltage distribution cabinet 1000V/2500A with 1 universal circuit breaker, capacity of compensate capacitor 12000 kilovar. 5. Furnace tilting type: Reducer drive, 531 reducer drive, trustiness, facility.
6. Master control board: The control circuit used one single master control board, it designed to be whole, and reduced connecting line greatly, fixed reliability, so avoided safe failure. This control circuit board is high degree of integration, the α angle automatic adjusted especially, that let power output of the equipment always was on constant condition, and electric power can be saved over 3% in comparison with same kind product. Safe start-up and automatic frequency-sweep.
7. Customer service: All the costs of seller’s experts go and work at abroad for return air tickets, accommodation and meals, will be borne by the buyer. The buyer shall compensate the experts at USD 150 per engineer per day for debugging period. After normal operation the seller should be responsible to guarantee repair or change of the faulty components in 6 months, such as master control board, reactor, compensate capacitor, hydraulic device, breaker, and furnace shell (except for lining break through, stoppage or shortage of cooling water supply for components).
8. Team of payment: Buyer pay 30% of full value in advance, when the goods deliver the buyer pay 70% of full value.
9. Delivery time: 45 days
Contact Person : | Ford |
---|